Trained and Qualified Erectors
Our Erectors are trained and qualified to the highest standards and are CITB, CSCS, CPCS, SSSTS and SMSTS compliant. We also have our own qualified Appointed Persons and Crane Supervisors for Lift Plans and Slingers/Signallers for installation, to ensure complete peace of mind when planning your project.
We follow four main principles during the process of the steel erection.
Our Steel Erection Process
Foundations
We ensure that the foundations are suitable and secure for the erection to commence.
Lifting
We then lift and place the components into position, most frequently with the use of cranes but occasionally it is achieved by jacking.
Alignment
We secure all components using bolted connections, not yet fully tightened, then align the structure, checking that all the column bases are perfectly lined and levelled and the columns are completely secured.
Bolting Up
We then bolt up, ensuring all the bolted connections are completely secure, meaning the structure can be used.
More of Our Steel Services
Design
Tekla Structures and CAD design, with detailed plans drawn to your exact specification and worked through with your architect.
Steel Fabrication
Up to 100 tonnes of fabricated steel a week, made precisely to your specification for domestic, commercial and industrial clients.
Temporary Works
Facade retention and temporary works, plus fire escapes, metal decking, stairs and facade support steelwork.