Steel frame being erected on site with a telehandler

Trained and Qualified Erectors

Our Erectors are trained and qualified to the highest standards and are CITB, CSCS, CPCS, SSSTS and SMSTS compliant. We also have our own qualified Appointed Persons and Crane Supervisors for Lift Plans and Slingers/Signallers for installation, to ensure complete peace of mind when planning your project.

We follow four main principles during the process of the steel erection.

Our Steel Erection Process

Foundations

We ensure that the foundations are suitable and secure for the erection to commence.

Lifting

We then lift and place the components into position, most frequently with the use of cranes but occasionally it is achieved by jacking.

Alignment

We secure all components using bolted connections, not yet fully tightened, then align the structure, checking that all the column bases are perfectly lined and levelled and the columns are completely secured.

Bolting Up

We then bolt up, ensuring all the bolted connections are completely secure, meaning the structure can be used.

Our own Appointed Persons, Crane Supervisors and Slingers/Signallers

More of Our Steel Services

Architectural design for structural steel in Essex and London

Design

Tekla Structures and CAD design, with detailed plans drawn to your exact specification and worked through with your architect.

Structural steel fabrication in Essex and London

Steel Fabrication

Up to 100 tonnes of fabricated steel a week, made precisely to your specification for domestic, commercial and industrial clients.

Temporary works and facade retention in Essex and London

Temporary Works

Facade retention and temporary works, plus fire escapes, metal decking, stairs and facade support steelwork.

Request a quote or need advice? Contact SCSL to discuss your requirements on 01268 763 330.